Multi-choice Question What are the main uncertainties in the AAMA set implementation planning process? Answers Option 1 terrain properties and the VSHORAD kill zones Option 2 recognized air picture for the region and the approach directions for the protected area Option 3 enemy MAA flight trajectory, enemy reconnaissance of the protected area Feedback Incorrect Option Incorrect Option Correct Option Solution Wrong (Feedback) Wrong (Feedback) Correct Option (Feedback) Question The “Zone concept” is based upon the principle that: Answers Option 1 the air threat to ground-based forces will tend to be a function of the nature of the ground-based asset itself Option 2 the vulnerability, survivability, numbers, technological sophistication, level of training, culture Option 3 the geometry of the battlefield to allow more survivable deployments, becomes very attractive Feedback Correct Option Incorrect answer Incorrect answer Solution Correct Option (Feedback) Wrong (Feedback) Wrong (Feedback) Question The areas within which it is necessary to consider technology alternatives to populate system and sub-system architecture proposals, consist of: Answers Option 1 weapons, sensors and C3I Option 2 requirements, capabilities and implementation Option 3 operational security, survivability and flexibility Feedback Correct Option Incorrect answer Incorrect answer Solution Correct Option (Feedback) Wrong (Feedback) Wrong (Feedback)